Search from various 영어 teachers...
Lude
My Proposal
We will remove the core and excavate the foundation of the existing breakwaters to the elevations and profile as shown on the drawings, and will use all such materials as back fill material for new breakwaters.
We will excavate all the materials above the design profiles except for the unsuitable materials. If we encountered suspected materials, we will immediately notify the Engineer and will carry out the soil sampling & testing to determine the silt content of the soil.
2013년 5월 21일 오전 6:12
Lude
언어 구사 능력
영어, 필리핀어(타갈로그어), 인도네시아어
학습 언어
영어
좋아할 수도 있는 읽을거리

English Vocabulary for Using Microsoft Office at Work
28 좋아요 · 7 댓글

How to Answer “How Was Your Weekend?” Naturally in English
56 좋아요 · 30 댓글

Why Some Jokes Don’t Translate: Understanding Humor in English
15 좋아요 · 6 댓글
다른 읽을거리
