A field trip
Last Satuday I went to Hoa Binh with my classmates in a field trip. We went to Hoa Binh hydro electricity plant. One Work ranks of second in Viet Nam’s hydropower (after Son La hydro electricity power that’s on Black River,too). It was started in 1979 and was inaugurated in 1994. Soviet Union help Vietnam a lots when contruction this project. It took them 15 years to complete, with total cost is about 1910.000.000.000VND.
Çeşitli İngilizce öğretmenleri arasından arama yapın...
Düzeltmeler · 1
1
A field trip
Last Satuday I went to Hoa Binh with my classmates in on a field trip. We went to Hoa Binh hydro electricity plant. It is ranked the second in Viet Nam’s hydropower (after Son La hydro electricity power that’s also on Black River,too). It was started in 1979 and was inaugurated in 1994. The Soviet Union helped Vietnam a lots with the contruction of this project. It took them 15 years to complete, with a total cost is of about 1910.000.000.000VND.
Good :-)
Daha hızlı mı ilerlemek istiyorsun?
Bu öğrenme topluluğuna katıl ve ücretsiz alıştırmaları dene!
Evden çıkmadan dil öğrenme fırsatını kaçırmayın. Deneyimli dil eğitmenlerimizden oluşan seçkimize göz atın ve ilk dersinize şimdi kaydolun!
Bugün öğrenmeye başlayın
