A wrong budget of the Panama Channel
At the beginning of the Panama Channel expansion, the constructors couldn’t look at the information of the previous construction company and they calculated a budget for their construction, but really, this work needed a higher budget than they had calculated. This great mistake was fundamentally due to three causes:
1. The concrete that construction was needed, should remains about 100 years, and at first project`s managers don’t thought about.
2. The basalt used in the preparation of the concrete, wasn`t as expected to be, and they needed another type of basalt that it was in a further place, so they spent more money on bring it.
3. When constructers thought about the project, they believed that in the first part of a project, would be hard ground to excavate but that was not true, and first of all, they had to dig 7 meters deeper after clean the place of mud.
A fine calculation of a project budget is necessary for a good understanding between the constructors and the stakeholders.
Problems than causes this three points, were resolved one by one, overcost blowing up the budget, first was 3118 million dollars, and finally was 3118+2698 million dollars.
The most important stakeholder was Sacyr, main constructor in Panama Channel, but there was other like Autoridad del Canal de Panama(ACP),Grupos Unidos por el Canal (GUPC).
If problem depend on my, for sure I give to actual constructors (Sacyr) the initial information of the previous company, and so they would have an idea for start that very big project.