The project manager's letter
Dear colleagues, in three days I am going to have a first design meeting with the oil port authority related to the prospective project.
In order to compose the design brief, I need the following information due at the end of the day:
1. Technological department - preliminary drawings of the reconstructed tank №2A.
2. HVAC department - rough sketches of the boiler room (collaborating with the electrical department).
Firstly, before the meeting, my presentation will be issued to certain specialists in customer office in order to the can comment on, and we will make amendments.
Hereby in one week, we will know if we need to go back to drawing board and redesign completely or just refine slightly.
Waiting for your documents.
Çeşitli İngilizce öğretmenleri arasından arama yapın...
Düzeltmeler · 2
0
The project manager's letter
Dear colleagues, in three days I am going to have the first design meeting with the oil port authority related to the prospective project.In order to compose the design brief, I need the following information due at the end of the day:
1. Technological department: preliminary drawings of the reconstructed tank №2A.
2. HVAC department: rough sketches of the boiler room (collaborating with the electrical department).
Firstly, before the meeting, my presentation will be issued to certain specialists in the customer's office in order to receive comments so we can make amendments.
Hereby, in one week we will know if we need to go back to the drawing board and do a complete redesign or just slight refinements.
We are waiting for your documents.
Daha hızlı mı ilerlemek istiyorsun?
Bu öğrenme topluluğuna katıl ve ücretsiz alıştırmaları dene!
Evden çıkmadan dil öğrenme fırsatını kaçırmayın. Deneyimli dil eğitmenlerimizden oluşan seçkimize göz atın ve ilk dersinize şimdi kaydolun!
Bugün öğrenmeye başlayın
