Busca entre varios profesores de Inglés...
Spain flagMarc
Bridge Intro The adjacent zone to the Les Cremades where there are the sportive and educational facilities, it was connected to the central-city by means of a Romanesque Bridge which had suffered different modifications since the end of the XIXth Century. The old bridge had structural deficiencies, because it was not able to resist the standard loads, the structure was unsafe for pedestrian since there are not handrails and the functional failure was imminent. The construction of a new bridge was fundamental paying attention in the idiosyncrasy of Caldes de Montbui, it is observed the bridges are indispensable components of the contiguous zone to the river. This area provides features with a high landscape value such as urban orchards (Urban Space Award 2016) and a natural treasure as important as the exuberant stream. Global solution a) Thinking the space like a unity with its environment, avoiding the creation of a set of juxtaposed and disjointed pieces. The project of the new bridge must have included a global solution. b) Getting away the new bridge to the Romanesque one. To minimize the difference between the dimensions of the both bridges. At the East riverside the access ramp of the old bridge was impossible, it had an excessive slope. For this reason, the built access ramp is turned with respect to the longitudinal direction. This actuation emphasized the asymmetrical space and enriched the place. c) The new bridge must have been a technical and modern structure. To respect the asymmetry of the Romanesque Bridge the new structure is framed, it is slender and asymmetrical. Thanks to the sloped piers, the new bridge is in visual tension and it seems lighter. Moreover it takes advantage of the environmental background of the stream and it minimizes its visual volume. d) At the Romanesque Bridge was necessary to demolish the two later extensions now its function is to accommodate the passage of the pedestrians. The actuation over the Romanesque Bridge remained the historical pavement and the stones obtained from the demotion works were used to build the access ramps and the handrails. e) The pavements of the adjacent streets are formed keeping the same typology that its counterpart on the stone bridge. Furthermore, the medieval walls were also restored according to the abutments of the Romanesque Bridge with sandstone assembling by means of stereotomy. f) Ashlar (80x40x20 cm) was used to finish the handrails and the upper sections of the walls.

Correcciones · 0

No pierdas la oportunidad de aprender un idioma desde la comodidad de tu casa. ¡Explora nuestra selección de profesores de idiomas con experiencia e inscríbete ya en tu primera clase!

Empieza a aprender hoy