Zoek tussen verschillende Engels docenten...
Lude
My Proposal
We will remove the core and excavate the foundation of the existing breakwaters to the elevations and profile as shown on the drawings, and will use all such materials as back fill material for new breakwaters.
We will excavate all the materials above the design profiles except for the unsuitable materials. If we encountered suspected materials, we will immediately notify the Engineer and will carry out the soil sampling & testing to determine the silt content of the soil.
21 mei 2013 06:12
Lude
Taalvaardigheden
Engels, Filipijns (Tagalog), Indonesisch
Taal die wordt geleerd
Engels
Artikelen die je misschien ook leuk vindt

English Vocabulary for Using Microsoft Office at Work
28 likes · 7 Opmerkingen

How to Answer “How Was Your Weekend?” Naturally in English
56 likes · 30 Opmerkingen

Why Some Jokes Don’t Translate: Understanding Humor in English
15 likes · 6 Opmerkingen
Meer artikelen
