Specials Validation process Part 2
General Steps
In order to have best practices when we do the QA validation for Specials, we define some general steps that we need to follow all the time for the validation process.
1. Download from Morpheus the PC and Special latest builds that you need to test and copy to the QA environment. Please use the latest PC release build and the Special build that we are validating and make sure that the builds doesn´t have any change from the original Morpheus builds, for this reason we recommended download the build and overwrite it in the QA environment.
2. Download from Morpheus the process map to the PC build that we will do the QA validation and copy with the correct SKU name in the Bullseye environment, furthermore, the specials component should be specified in the “remusattributes” element. Please make sure that you are using the short process map version and copy it in the correct Bullseye database. There are some states that is not necessary to run when we are doing the QA test for Specials.
3. Unregister the UUT from the ILO.
4. Run the teardown before register the server, please make sure that you are register the run with the correct FXML file.
5. Do the FW downgrades that there are necessary, depends to the CID requirements, this step is very important because we need to validate that all the FW updates were applied correctly.
6. Download the compare bios_setting_ignore_list.txt and make sure that any of these settings are include in the speciaslbiosconfig.xml, but that those are include in the final BIOS config file.
7. When finish the test, please take all the screenshots from the BIOS and the ILO that you consider necessary to validate the requirements, please take as reference the CID and if you have doubts, ask on time.
8. Please run the download_store_files.bat tool in order to download all the Remus files.
9. Attach all the necessary files and pictures in the Jira QA sub task, of this way we can confirm that all the requirements were implemented correctly.
Szukaj różnych nauczycieli angielski...
Poprawki · 1
0
Specials Validation process Part 2
General Steps
In order to have best practices when we do the QA validation for Specials, we define some general steps that we need to follow all the time for the validation process.
1. Download from Morpheus the PC and Special latest builds that you need to test and copy to the QA environment. Please use the latest PC release build and the Special build that we are validating and make sure that the builds do not have any changes from the original Morpheus builds, for this reason we recommended download the build and overwrite it in the QA environment.
2. Download from Morpheus the process map to the PC build that we will do the QA validation and copy with the correct SKU name in the Bullseye environment, furthermore, the specials component should be specified in the “remusattributes” element. Please make sure that you are using the short process map version and copy it in the correct Bullseye database. There are some states that do not require this step when we are doing the QA test for Specials.
3. Unregister the UUT from the ILO.
4. Run the teardown before register the server, please make sure that you are register the run with the correct FXML file.
5. Do the FW downgrades that there are necessary, it will depends to the CID requirements, this step is very important because we need to validate that all the FW updates were applied correctly.
6. Download the compare bios_setting_ignore_list.txt and make sure that any of these settings are included in the speciaslbiosconfig.xml, but that those are include in the final BIOS config file.
7. When you finish the test, please take all the screenshots from the BIOS and the ILO that you consider necessary to validate the requirements, please take as reference the CID and if you have doubts, ask on time.
8. Please run the download_store_files.bat tool in order to download all the Remus files.
9. Attach all the necessary files and pictures in the Jira QA sub task, of this way we can confirm that all the requirements were implemented correctly.
Muy bien!!!!
Chcesz robić postępy szybciej?