Wich sentence is correct? Thank you very much in advance! Backfilling shall be prepared till the bottom of bedding under paving structures. / or: Backfilling shall be prepared up to the bottom of the bedding under paving structures. * The pavement structure is the same as the plant road's. / The pavement structure is the same as by the plant road. * It can be stated, that with the use of a 10 m3 storage capacity in general it is enough to drain the storage basin monthly.

Korrekturen · 2

1

Which sentence is correct? Thank you very much in advance!

Backfilling shall be prepared till the bottom of bedding under paving structures. / or: Backfilling shall be prepared up to the bottom of the bedding under paving structures. The second version is good English. I don't fully understand the context of course, but I am sure that is must be all correct and clear to someone working in paving structures etc. 
*
The pavement structure is the same as the plant road's. / The pavement structure is the same as by the plant road. The first version is good. 
*
It can be stated, that with the use of a 10 m3 storage capacity in general it is enough to drain the storage basin monthly. Very good. 

Möchten Sie schneller voran kommen?

Treten Sie dieser Lern-Community bei und testen Sie kostenlose Übungen!

Verpassen Sie nicht die Gelegenheit, bequem von zu Hause aus eine Sprache zu lernen. Stöbern Sie in unserer Auswahl an erfahrenen Sprachlehrern und melden Sie sich jetzt zu Ihrer ersten Unterrichtsstunde an!

Heute mit dem Lernen beginnen