Выбрать из множества учителей по предмету английский...
Russia flagKaterina
Business Eng. Ex.2 The task: fill in the articles or possessive pronouns wherever necessary. Don't know why but I always have problem with it. A. Well, Mr B., let’s resume our talks, shall we? B. Yes, we were going to look at a guarantee clause today. We guarantee the highest standards, excellent performance and workmanship. In fact, the models you are buying are the latest. We put them on market a year ago. So the guarantee period is 12 months from date of putting equipment into operation. A. That’s good. I’ve got two points to make here. One is that we want equipment to meet the specific conditions. So we expect that final tests to be made at our plant. B. No problem. Are you going to issue a document about that? A. Yes, we call it an Acceptance Report. The date of Acceptance Report will be considered to be date of putting equipment into operation. B. That’s O.K. with me. Anything else? A. Yes, my second point. If something goes out of order do you prefer replacing defective equipment? B. Or eliminating defects at plant. That will depend on a kind of defects. Anyway, it will be done at our expense.

Исправления · 3

0

Business Eng. Ex.2

The task: fill in the articles or possessive pronouns wherever necessary. Don't know why but I always have problem with it.

A. Well, Mr B., let’s resume our talks, shall we?

B. Yes, we were going to look at a the [because it's a particular guarantee clause] guarantee clause today. We guarantee the highest standards, excellent performance and workmanship. In fact, the models you are buying are the latest. We put them on the market a year ago. So the guarantee period is 12 months from the date of putting the equipment into operation.

A. That’s good. I’ve got two points to make here. One is that we want the equipment to meet the specific conditions. So we expect that the final tests to be made at our plant.

B. No problem. Are you going to issue a document about that?

A. Yes, we call it an the Acceptance Report. The date of the Acceptance Report will be considered to be the date of putting the equipment into operation.

B. That’s O.K. with me. Anything else?

A. Yes, my second point. If something goes out of order do you prefer replacing [to replace] defective equipment?

B. Or eliminating [to eliminate] defects at the plant. That will depend on a the kind of defects. Anyway, it will be done at our expense.

Вы хотите продвигаться быстрее?

Присоединяйтесь к этому обучающему сообществу и попробуйте выполнить бесплатные упражнения!

Не упустите возможность выучить язык, не выходя из дома. Ознакомьтесь с подборкой опытных преподавателей и запишитесь на свой первый урок прямо сейчас!

Начните учиться сегодня