A field trip
Last Satuday I went to Hoa Binh with my classmates in a field trip. We went to Hoa Binh hydro electricity plant. One Work ranks of second in Viet Nam’s hydropower (after Son La hydro electricity power that’s on Black River,too). It was started in 1979 and was inaugurated in 1994. Soviet Union help Vietnam a lots when contruction this project. It took them 15 years to complete, with total cost is about 1910.000.000.000VND.
寻找适合你的 英语 教师…
修改 · 1
1
A field trip
Last Satuday I went to Hoa Binh with my classmates in on a field trip. We went to Hoa Binh hydro electricity plant. It is ranked the second in Viet Nam’s hydropower (after Son La hydro electricity power that’s also on Black River,too). It was started in 1979 and was inaugurated in 1994. The Soviet Union helped Vietnam a lots with the contruction of this project. It took them 15 years to complete, with a total cost is of about 1910.000.000.000VND.
Good :-)
想快些进步吗?
加入这个学习社区,来试试免费的练习吧!
Don’t miss out on the opportunity to learn a language from the comfort of your own home. Browse our selection of experienced language tutors and enroll in your first lesson now!
Start Learning Today
