A field trip
Last Satuday I went to Hoa Binh with my classmates in a field trip. We went to Hoa Binh hydro electricity plant. One Work ranks of second in Viet Nam’s hydropower (after Son La hydro electricity power that’s on Black River,too). It was started in 1979 and was inaugurated in 1994. Soviet Union help Vietnam a lots when contruction this project. It took them 15 years to complete, with total cost is about 1910.000.000.000VND.
Tìm kiếm từ nhiều giáo viên Tiếng Anh...
Bài chữa · 1
1
A field trip
Last Satuday I went to Hoa Binh with my classmates in on a field trip. We went to Hoa Binh hydro electricity plant. It is ranked the second in Viet Nam’s hydropower (after Son La hydro electricity power that’s also on Black River,too). It was started in 1979 and was inaugurated in 1994. The Soviet Union helped Vietnam a lots with the contruction of this project. It took them 15 years to complete, with a total cost is of about 1910.000.000.000VND.
Good :-)
Bạn muốn tiến bộ xa hơn?
Hãy tham gia cộng đồng học tập này và thử nghiệm những bài tập miễn phí!
Đừng bỏ lỡ cơ hội học ngoại ngữ ngay tại nhà. Hãy xem danh sách các gia sư ngôn ngữ giàu kinh nghiệm của chúng tôi và đăng ký buổi học đầu tiên ngay hôm nay!
Bắt đầu học hôm nay
