Tìm kiếm từ nhiều giáo viên Tiếng Anh...
Brazil flagNey Fernandes
Bicycle lane The second stage of the bicycle lane that connect the neighborhoods of Santo Amaro, In Recife, and Varadouro, in Olinda, was inaugurated last Wednesday. A station of bicycle sharing also started to work this day. With 2,9 km of extention, the section is a continuation of the array of bicycle lane that connected the “Marco Zero” to “Santo Amaro”, making a total of 8 km of work, that is expecting to be 30 km of extention.

Bài chữa · 3

1

Bicycle lane

The second stage of the bicycle lane that connects (1)the neighborhoods of Santo Amaro, In Recife, and Varadouro, in Olinda, was inaugurated last Wednesday. A station of bicycle sharing   bicycle station (I'm unsure what the "sharing" was for. I assume this is just a normal bicycle project in which you rent bicycles) also started to work this day.

With a length 2,9 km of extention (the correction was on the position. The green text is because "length" was a better word to use in this context), the section is a continuation of the array of bicycle lanes that connected (connect sounds slightly better but connected is ok too) the “Marco Zero” to “Santo Amaro”, making a total of 8 km of work, that is expecting for what is expected  to be 30 km of extention.


1)The correction will depend on what you reallyw ant to say. Is the second stage the last stage or is there a third and fourth stage? If the lane already connects the two places, then the "connects" is the only correction. If the lane isn't yet connecting the two places, the correction will be "that WILL connect the..."




Bạn muốn tiến bộ xa hơn?

Hãy tham gia cộng đồng học tập này và thử nghiệm những bài tập miễn phí!

Đừng bỏ lỡ cơ hội học ngoại ngữ ngay tại nhà. Hãy xem danh sách các gia sư ngôn ngữ giàu kinh nghiệm của chúng tôi và đăng ký buổi học đầu tiên ngay hôm nay!

Bắt đầu học hôm nay